Detailed Project Report including Topographic Surveys, Preparation of Plan and Profile, Preparation of Detailed Drawings of Structures Preparation of EPC Documents including Technical Schedules and Land Acquisition Plan of Junction at km. 273.600 on NH-48 . Length – 7.845 Km; 4−Lane; Total Cost – Rs . 248.61 Crore.
Nature of project: Detailed Project Report
Name of Client: Project Director, NHAI, PIU – Jaipur
Length: 7.845 Km
Estimated capital cost of Project (in Rs. crores): 248.61 Crore.
Lane of Road: 6 Lane
Status: Complete
PPP / EPC / HAM / DBFOT / BOT / ADB: EPC
Duration- From May 2024 to Oct 2025