1. Consultancy Services for Authority’s Engineer for Supervision of civil construction works for Construction of Northern Kota Bypass from Design Ch. 0.000 (km 391/100 of NH-76) to Design Ch. 10/300 (Rangpur road) [Package – I] and from Design Ch. 10/300 (Rangpur road) to Design Ch. 14.200 (km 11/700 of SH-33) with link road of 452m length with SH-33 [Package – II] in the state of Rajasthan on EPC mode under NH (O); Length: 14.2 Km; 2 Lane with paved shoulder; Flexible Pavement. Total Length – 14.2 Km, 2 Lane with Paved Shoulders, Project Cost – 150 Cr.
View Details
2. Independent Engineer services for development and construction of Two laning with paved shoulder of Salasar – Nagaur section of NH-65 from Km 45.400 (Design Chainage 151.141) to Km 171.170 (Design Chainage 270.735) – Design length (119.594 Km), Total Length – 119.594 Km in the State of Rajasthan on Hybrid Annuity mode under NHDP Phase-IV. Total Length – 119.59 Km, 2 Lane with Paved Shoulder, Project Cost – 480 Cr.
View Details
3. Consultancy Services for Authority’s Engineer for Widening to 4-lane with paved shoulder with CC pavement from km 256/550 to km 292/500 on Kota-Darah Section of NH-12 (Kota-Jhalawar Road) in the State of Rajasthan on EPC mode; Length: 43.450 Kms; 4 Lane; Rigid Pavement;
View Details
4. Independent Engineer Services during Operation & Maintenance of Jodhpur – Pali Section of NH-65 from Km. 308.000 to Km.366.000 & including Bypass to Pali starting from Km. 366.000 of NH-65, Connecting NH – 14 at Km. 114.000 in the State of Rajasthan through Public Private Partnership (PPP) on Design, Built, Finance, Operate and Transfer (the “DBFOT”) Basis stage of selected road stretches under BOT projects in the State of Rajasthan. Total Length – 71.53 Km, 4-Lane, Project Cost – 332.70 Cr.
5. Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways/ State Roads for up gradation to Two/Four lane with paved shoulder configuration. Package-47, section from Panipat (Junction with NH-44)-Shamli – Muzaffarnagar-Bijnor – Nagina road in the State of Uttar Pradesh & Haryana. Total Length – 130 Km, 4-Lane, Project Cost – 2069 Cr.
6. Consultancy Service for Project Management Phase I including preparation of Detailed Project Report of selected stretches / corridors of National Highways for up gradation to Two / Four lane with paved shoulder configuration of “Highway starting form junction with NH-40 at Kurnool connecting Nandikotkur, Atmakur and terminating at its junction with NH-765 at Dornala. Category-I Packages No. NH/IAHE/30, Total Length – 125.350 Km. 4 Lane, Project Cost – 1764 Cr.
7. Consultancy For Preparation of feasibility study/Detailed project Report of selected state road Stretches For Two/four Laning With paved shoulder NH Configuration Under Bharat mala Scheme – I Nachna Bharewala Road to Bahla and Nachna fata to Bharewala in the state of Rajasthan (Package -9); Total Length – 77.20 Km, 2/4 Lane with Paved Shoulder, Project Cost – 375 Cr.
8. Consultancy services for Feasibility study and preparation of detailed project report for the proposed construction of bypass for Barmer city on NH-15 Jaisalmer – Barmer – Sanchore stretch as 2 lane with paved shoulders in the state of Rajasthan. Total Length – 21.760 Km, 2 Lane with Paved shoulders, Project cost – 125 Cr.
9. Consultancy services for Preparation Feasibility Report for two laning of (i) Uniara – Dooni – Anwa section of SH-34A (the “Highway-I”); (ii) Beawar – Masuda – Goyla section of SH-26A (the “Highway-II”); (iii) Sawarda – Rupangarh – Ajmer section of SH-100 (the “Highway-III”); (iv) Hurda – Banera section of SH-39A (the “Highway-IV”); (v) Banera – Bigod section of SH-39A (the “Highway-V”); totalling 282.39 Km. (the “Project”) through Public Private Partnership (the “PPP”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) basis under Package-23. Total length – 282.39 Km, 2-Lane, Project Cost – 529.4 Cr.
10. Consultancy Services for Project Management Phase-I including Preparation of Detailed Project Report for Upgradation of Junction with NH-53 near Songudh-Ahwa, in the state of Gujarat, Sarad, Vani – Pimpalgaon Baswant in the state of Maharashtra section of NH-953 to Two / Four Lane with Paved Shoulder Configuration (Package No: NH/IAHE/17); Length: 120 Km; 2/4 Lane; Flexible Pavement; Cost of Project Rs. 800 Crores. Client: Indian Academy of Highway Engineers. Total Length – 120 Km, 2/4 Lane with Paved Shoulders, Project Cost – 800 Cr.
11. Consultancy Services for Preparation of Feasibility Report for two laning of (i) Phalodi – Nagaur comprising the section from Phalodi to Nagaur (the “Highway-I”), (ii) Beawar – Gulabpura comprising the section Beawar to Gulabpura (the “Highway-II”), (iii) Beawar – Pisangan – Tahla comprising the section from Beawar to Tahla (the “Highway-III”), (iv) Arai – Sarawar comprising the section Arai to Sarwar (the “Highway-IV”), (v) Kuchaman – Renwal – Kishangarh comprising the section Kucahman to Kishangarh (the “Highway-V”) and (vi) Talanpur – Dhanapa – Kawaspura (Mining) comprising the section from Talanpur to Kawaspura (the “Highway-VI”) totaling length – 360.81 Km (the “PPP”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) basis under Package – 12. Total length – 360.81 Km, 2-Lane, Project Cost – 586.48 Cr.
12. Consultancy Services for Preparation of Feasibility Report for two laning (i) Borawas to Kaludi length – 38 Km. (the “Highway-I”), (ii) Mundra to Desuri length – 28 Km. (the “Highwy-II”), (iii) Deoli to Kanwas length – 10 Km. (the “Highway-III”), (iv) Kapren to Baran length – 70 Km. (the “Highway-IV”), totaling length – 128.932 Km (the project) through Public Private Partnership (the “PPP”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) basis under Package-EWC-S. Total length – 128.39 Km, 2-Lane, Project Cost – 345.08 Cr.
13. Consultancy Services for Preparation of Feasibility Report for two laning of (i) Km. 0 to 200 of SH-20 comprising the section from Sikar to Nokha (the “Highway-I”), (ii) Km. 0 to 113 of SH-41 comprising the section from Fathehpur to Rajgarh (the “Highwya-II”), (iii) Km. 0 to Km. 144 of SH-60, SH-20, SH-19 comprising the section from Nagaur to Salasar (the “Highway-III”) and (iv) Km. 0 to Km. 71 of MDR-05 comprising the section from Bikaner to Jasrasar (the “Highway-IV”) totaling length – 531 Km (the project) through Public Private Partnership (the “PPP”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) basis under Package-5. Total length – 531 Km, 2 Lane with Paved Shoulders, Project Cost – 1349.5 Cr.
14. Consultancy Services for Preparation of Feasibility Report for two laning of (i) Suratgarh to Anupgarh comprising the section from Suratgarh to Anupgarh (the “Highway-I”), (ii) Sadulshahar – Sangaria – Chaiyan comprising the section from Sadulshahar to Chaiyan (the “Highway-II”), (iii) Bidasar – Sri Dungargarh – Kalu comprising the section from Bidasar to Kalu (the “Highway-III”), (iv) Jodhpur – Balesar – Shergarh comprising the section from Jodhpur to Shergarh (the “Highway-IV”) and (v) Hanumangarh – Sri Ganganagar comprising the section from Hanumangarh to Sri Ganganagar (the “Highway-V”) totaling length – 393.66 Km (the project) through Public Private Partnership (the “PPP”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) basis under Package-21. Total Length – 393.66 Km, 2 Lane with Paved Shoulders, Project Cost – 735.63 Cr.
15. Preparing Detailed Project Report Construction of 2 lane Northern Bypass – Phase – II (Gamach Phatak Railway Crossing to NH-12 Ballop). Total Length – 12.73 Km, 2 Lane with Paved Shoulders, Project Cost – 195 Cr.
16. Preparation of Feasibility & Detailed Project Report for 2-Laning with paved shoulders of road from Mahua-Hindaun to Karauli. SH-22, Total Length- 65.20 kms., 2 Lane with Paved Shoulders, Project Cost – 168.00 Cr.
17. Preparation of Feasibility cum Detailed Project Report for Road Banswara to Ratlam. SH-10 Total Length- 38+5= 43 kms., 2-lane with Paved Shoulders, Project Cost – 115 Cr.
18. Preparation of feasibility report for 2 Laning of the section from Chomu to Mahla via Renwal Jobner SH – 8B , SH-19, SH-2C, SH-8A and ODR 02 on PPA basis with VGF from GOI and GOR. Total Length- 82 kms., 2-Lane, Project Cost – 134.20 Cr.
19. PMC Services for Construction Supervision , quality assurance , quality contorl and project management servcies for Ghaziabad Aligarh Section of NH-91 Km 23.60 to 140.20 in the state of UP under NHDP Phase III to Ghaziabad – Aligarh Expressway Pvt. Ltd.( GAPEL) Noida, UP. Total length – 116.60 Km, 4-Lane, Project Cost – 1000.21 Cr.
20. Design and supervision of widending of existing 2 lanes to 6 lanes divided carriagway facility including Rehabilation of existing 2 lanes for km 273.500 to km 363.885 on Jaipur – Kishangarh, section of NH – 8 . Total Length – 90 Km, 6-Lane, Project Cost – 750 Cr.
21. Construction, Supervision, Quality Assurance, Quality Contorl and project Management services for ” Chandikhole – Jagatpur – Bhubaneshwar, section of NH-5 from km 413/000 to Km 418 and Km 0/000 to 62/000 (total lenght 68 kms) in the State of Odisha under NHDP Phase III. Total Length – 68 Km, 6-lane, Project Cost 700 Cr.
22. Supervision Consultancy Services for 4 laning of Beawar – Pali section of NH-14 Km 0/000 to 113/000 in state of Rajasthan , Ajmer – Pali District. Total Length – 99 Km, 4-Lane, Project Cost – 900 Cr.
23. Independent Due Diligence Work – Independent assessment of Operation and Maintenance requirements and major maintenance requirement – Road Infrastructure Development Company of Rajasthan-Phase I, II & III
24. Independent Due Diligence Work – Independent assessment of Traffic Forecasting and Toll Revenue Estimations for – Road Infrastructure Development Company of Rajasthan-Phase I, II & III
25. Independent Due Diligence Work – Independent Assessment of Operation and Maintenance requirements and major maintenance requirement of Chenani Nashri Tunnelway Ltd.,
26. Safety Consultancy work for Construction of 4 lane ROB and its approaches in lieu of existing level crossing No. 43 at Km. 13.00 on NH-162 A in Fatehnagar in District Udaipur in the State of Rajasthan (NH-162A/RJ/2017-18/705) on EPC mode.
27. Proof checking of Construction of Toll Plaza in LHS carriageway at Km. 1054+967 to Km. 1055+467 (New Ch. 1055+217) and RHS carriagway at Km. 1059+050 to Km. 1059+450 (New Ch. 1059+350) and widening of carriagway from 4 Lane to 6 lane between proposed staggered Toll Plaza of NH 27 in the State of Rajasthan.
28. Proof checking of 4 laning of Medshi to Washim from Km. 47+700 to Km. 92+200 (Design Chainage) of NH-161 including Bypasses at Malegaon and Washim in the State of Maharashtra on EPC Mode.
29. Proof checking of 4 laning of Washim to Pangare from Km. 92+200 to Km. 134+500 (Design Chainage) of NH-161 including Bypasses at Kanergaon and Hingoli in the State of Maharashtra on EPC Mode.
30. Independent Engineer Services for supervision of Four laning of Dhrol – Bhadra Patiya section of NH-151A (Between Ex. Km 5+700 to Km 13+600 of SH-25) and Bhadra Patiya – Pipaliya Section of NH-151A (Between Ex. Km 73+000 to Km. 44+800 and Ex. Km. 38+350 to 24+000 of CSH-6) in Gujarat through Public Private Partnership (PPP) on Hybrid Annuity mode. Total Length – 50.416 Km, 4-Lane, Project Cost – 882 Cr; Rigid Pavement
31. Authority Engineer services for development, upgradation of (i) Banar-Bhopalgarh-Kuchera (SH-63) length: 126.500 km. (Package No. WB/ RSHDPII/EPC/01). (ii) Bhawi – Pipar – khimsar (SH-86C) Length 83.225 km (Package No. WB/RSHDP II/EPC/02) (iii) Jodhpur-Marwar Junction- Jojawar Highway (sh-61 & 61A) Length 119.095 km (Package No. WB/ RSHDP II/EPC/03) in the state of Rajasthan on EPC mode . Total Length – 328.82 km ; 2 lane without Paved Shoulder; Project Cost- 612.88 Crore.
32. Consultancy Services for Authority’s Engineer for Supervision of construction for Consultancy Authority’s Engineer Services of Up-gradation 4 Lane with Paved Shoulders from Beawar-Gomti Section and existing (between km 58.245 to km 108.600) of NH-8 (New NH-58) Beawar-Gomti Section(Package-I) , existing km 108.600 to km 144.000 & km 158.420 to km 173.300 of NH-8 (New NH-58) Beawar-Gomti Section (Package-II) and existing km 144.000 to km 158.420 of NH-8 (New NH-58) Beawar-Gomti Section (Package-III) on EPC MODE. Total Length – 64.705 km ;4 lane with Paved Shoulder; Project Cost- 262.44 Crore
33. Independent Engineer Services for Construction of 4-Lane with paved shoulders from Delhi – vadodara Greenfield expressway near Bandikui to Jaipur in Bharatmala Pariyojana Phase1 on Hybrid Annuity mode. Total Length – 66.916 Km, 4-Lane with paved shoulders, Project Cost – 1368 Cr.
34. Independent Engineer Services for Four laning of NH-365A from Kodad (Design km 0.00/ Existing km 185.00 of NH65) to Khammam (Design km 31.800 / Existing Km 29.400) in the state of Telangana under Bharatmala Pariyojana on Hybrid Annuity Mode (HAM). Total Length – 31.80 km; 4 lane; Project Cost: 1039.90 Crores
35 Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km 88+000 to km 170+000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-2]. Total length – 82 Km, 6-Lane, Project Cost – 1165.62 Cr.
36 Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km 1+900 to km 90+000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) [AJ/Construction Supervision/Package-4]. Total length – 88.10 Km, 6-Lane, Project Cost – 1363.83 Cr.
37 Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km 170+000 to km 252+000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-3]. Total length – 82.50 Km, 6-Lane, Project Cost – 1261.22 Cr.
38. Consultancy services for preparation of feasibility Study report cum preliminary design report for Two laning of Malbamori – Mangrol-Baran (SH-01) funded by World Bank Trance-2. Total Length – 40.100 Km, 2 Lane, Project cost – 257 Cr.
39. Consultancy services for preparation of feasibility Study report cum preliminary design report for Two laning of Golyana –Nawalgarh (MDR-25B)funded by World Bank Trance-2 . Total Length – 21.850 Km, 2 Lane, Project cost – 133.82 Cr.
40. Consultancy services for preparation of Detailed Project Report for upgradation and construction work for Nasirabad-Sarwar-Kekri-Deoli road (SH-26) . Total Length – 53.068 Km, 4 Lane, Project cost – 575.28 Cr.
41. Consultancy services for preparation of feasibility Study report / Detailed Project Report of selected road stretches for NH connectivity under Bharat Mala Scheme – 3(a) Pokharan – Fassund- Undu-Kashmir-Nimbhala (NH-15) 3(b) Harsana – Phata to Uttarlai Air Base ( Package No. BM-22) . Total Length – 150.60 Km, 2 Lane with Paved Shoulder, Project cost – 491.6 Cr.
View Details
42. Consultancy Services for Preparation of Feasibility Study and Detailed Project Report to provide Widening of existing Road to 2 lane with Paved Shoulders configuration for Highway Improvement to Pusesavali Wangi Nagthane Walwa Nagthane Walwa Boregaon Bahe Tambve Kasegoan Wategoan Takave road SH 158 Km 0/00 to 70/00 tal. Walwa Dist. Sangli in the state of Maharashtra under Maharashtra Road Improvement Project(MRIP) with financial assistance from Asian development bank(ADB) Package No. DPR-13 . Length – 70 Km. 2−Lane Total Cost – Rs. 301.83 Crore.
43 Consultancy Services for Preparation of Feasibility Study and Detailed Project Report to provide Widening of existing Road to 2 lane with Paved Shoulders configuration for Highway Improvement to Pusesavali Wangi Nagthane Walwa Borgaon Bahe Tambve Kasegoan Wategoan Takave road SH 158 Km 70/00 to 147/500 tal. Walwa Dist. Sangli in the state of Maharashtra under Maharashtra Road Improvement Project(MRIP) with financial assistance from Asian development bank(ADB) Package No. DPR-14. Length – 77.50 Km; 2−Lane with Paved Shoulder; Total Cost – Rs. 509.699 Crore.
44 Consultancy Services for Preparation and finalization of Detailed Project Report for the projects under Hybrid Annuity Model Program Phase – II for Packages PN-11 (15), AM-II (44), AM-II (46) and AM-II (47) in the state of Maharashtra. Length – 225.44 Km; 2−Lane; Total Cost – Rs .1695.38 Crore.
45. Consultancy Services for Preparation of Feasibility Study cum Detailed Project Report, Survey and Preparation of Land Plan by adopting Lidar or similar technology for Widening of existing Road to 2 lane with Paved Shoulder configuration for Highway Improvement to Malharpeth-Umbraj-Masur-Mayani Dighanchi Pandharpur road SH-143 section Malharpeth Umbraj Masur Mayani to Satara District BorderKm. 0/00 to 60/00 Tal. Karad District Satara in the state of Maharashtra under Maharashtra Road Improvement Project (MRIP) with financial assistance from Asian Development Bank (ADB) Package No. DPR-7 . Length – 60 Km; 2−Lane with Paved Shoulder; Total Cost – Rs. 480.00 Crore.
46 Consultant for preparation of Detailed Project Report for the highway Projects under Maharashtra Road Improvement Project Phase III with financial assistance from Asian Development Bank(ADB) – Package Nos. DPR-C Regional Division – Aurangabad / Nanded- Package 3C . Total Length – 236.80 Km, 2 Lane, Project cost – 572.00 Cr.
47 Detailed Project Report including Topographic Surveys, Preparation of Plan and Profile, Preparation of Detailed Drawings of Structures Preparation of EPC Documents including Technical Schedules and Land Acquisition Plan of Junction at km. 273.600 on NH-48 . Length – 7.845 Km; 4−Lane; Total Cost – Rs . 248.61 Crore.
1. Independent Engineer services for Six Laning of Thaliparambha-Muzhapilangad section from Km 137.900 to Km. 170.600 of NH-17 (New NH-66) under Bharatmala Pariyojna in the state of Kerala on Hybrid Annuity Mode. Total Length – 29.948 Km.; 6-Lane; Project Cost Rs. 1438.98 Crores.
2. Independent Engineer services for Six Laning of Thalapady to Chengala section of NH-17 (New NH-66) from Ch. 17+200 (ex. km 17+200) to Ch. 56+200 (ex. Km 57+200) under Bharatmala Pariyojna in the state of Kerala on Hybrid Annuity Mode (N/04002/05001/KL). Total Length – 39 Km.; 6-Lane; Project Cost Rs. 1224.46 Crores.
3. Consultancy Services for Authority’s Engineer for Supervision of Construction of Eight Lane access-controlled expressway starting from MP/Gujarat Border near Chhayan village and ending at Junction with NH-47 near Bhamaiya Village in Panchmahal District (Ch. 696+920 to Ch. 781+282) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat [Delhi-Vadodara/NH-148N/AE/Pkg11]. Total Length – 85.47 Km, 8-Lane, Project Cost – 3105.39 Crores.
4. Independent Engineer services for Six Laning of Neeleshwaram to Thaliparambha section of NH17 (New NH-66) from Ch. 94+540 (ex. km 96+450) to Ch. 134+650 (ex. Km 137+900) under Bharatmala Pariyojna in the state of Kerala on Hybrid Annuity Mode. Total Length – 40.11 Km, 6-Lane, Projecct Cost – 1490.96 Cr.
5. Consultancy services for Independent Engineer for supervision of Construction of Eight-lane Vadodara-Mumbai Expressway from Ch. 103.400 to Ch. 190.000 (Talasari to Gandeva section of Vadodara-Mumbai expressway) in the state of Gujarat, UT of DNH and Maharashtra on Hybrid Annuity Mode under Bharatmala Pariyojana. Total Length – 86.6 km, 8-Lane, Project Cost – 3523.51 Cr.
6. Supervision Consultancy Services for construction supervision of the Rehabilitation and Reconstruction work and other incidental works of Deoli-Kota section (Design Km.167.624 to Km. 250.144) Section of NH- 12 (New NH- 52) in the state of Rajasthan. Total Length – 82.52 Km, 4-Lane, Project Cost – 353.55 Cr.
7. Consultancy Services for Authority’s Engineer for Supervision of i)“Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP) in the state of Nagaland on EPC mode (Pkg – II) under Bharatmala NH(O) – TSP”. Total Length – 36.95 Km, 2-Lane, Project Cost – 419.16 Cr.
8. Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km (-) 0+300 to km 88+000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Haryana and Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) [AJ/Construction Supervision/Package-1]. Total Length – 88.30 Km, 6-Lane, Project Cost – 1590.67 Cr.
9. Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield months) highway from km 28+700 to km 53+000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-2]. Total Length – 82.00 Km, 6-Lane, Project Cost – 1203.37 Cr.
10. Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km 53+000 to km 88+000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-3]. Total length – 82.50 Km, 6-Lane, Project Cost – 1332.78 Cr.
11. Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km 1+900 to km 90+000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) [AJ/Construction Supervision/Package-4].
12. services for Authority’s Engineer for Supervision of
(i) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 32.00 Package -1,2 & 3 in the state of Nagaland Under SARDP-NE on EPC Mode. Total Length – 32 Km, 2-Lane, Project Cost – 467.61 Cr.
13. Consultancy services for Authority’s Engineer for Supervision of
i) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 32.00 to design Km 43.454 [Design Length – 11.454 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package IV)
(ii) Upgradation of existing road to 2-Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length – 26.249) of NH -39 (New NH – 02) under NH(O) – TSP in the state of Nagaland in EPC mode. Total Length – 37.70 Km, 2-Lane, Project Cost – 367.88 Cr.
14. Independent Engineer Services for Up-gradation / Improvement and Strengthening Work for Development of Existing Road from Km 0/000 to 212/000 of Jaipur-Bhilwara section of SH-12 in the State of Rajasthan, to be implemented on ‘DBFOT’ pattern. Total Length – 212.00 Km, 2-Lane, Project Cost – 220 Cr.
15. Independent Engineer Services during Operation & Maintenance stage of (1) Four laning of Jaipur-Reengus Section of NH-11 (New NH-52) from Km 246.300 to Km 298.075 on BOT (Toll) basis on DBFOT pattern under NHDP Phase-III (Length : 51.842 KM) in the state of Rajasthan. Total Length – 51.84 Km, 4-Lane.
16. Independent Engineer Services during Operation & Maintenance stage of Four laning of Reengus-Sikar section of NH-11 (New NH-52) from Km 298.075to Km 341.962 of NH-11 (New NH 52) on BOT (Annuity) basis on DBFOT pattern under NHDP Phase-III (Length : 43.887 KM) in the state of Rajasthan. Total Length – 43.88 Km, 4-Lane.
17. Independent Engineer Service during Operation & Maintenance stage of selected road stretches under BOT projects in the state of Rajasthan. [ 4 Lanning of Gomati Chouraha Udaipur Project NH- 8 Km. 177+000 to 260+100 (Total Km. 79.31)]. Total Length – 79.31 Km, 4-Lane.
18. Independent Engineer Services during Operation & Maintenance stage of 6 laning of Jaipur – Kishangarh NH-8 Km 273.500 to 363.885 total lengths – 90.385 under BOT projects in the State of Rajasthan. Total Length – 90.38 Km, 6-Lane.
19. Consultancy Services for Preparation of Feasibility Study report cum preliminary design report for Two-Laning of Golyana-Nawalgarh (MDR-25B) (the “Highway”); Totaling 24.00 km. (The “Project”). Total Length – 24 km, 2-Lane, Project Cost Rs. 54.00 Crores.
20. Consultancy Services for Preparation of Feasibility Study report cum preliminary design report for Two-Laning of Mal Bamori-Mangrol – Baran (SH-01) (the “Highway”); Totaling 41.20 km. (The “Project”). Total Length – 41.20 Km, 2-Lane, Project Cost Rs. 125 Crores.
21. Consultancy services for “preparation of DPR for Construction of Bypasses at Kotputli & Narheda” complete as per requirement, guideline, scope of work (enclosed) and direction of Engineer-in-charge including GST & all other Taxes as applicable. (Approx Length of Bye-Pass: Kotputli-10 Km, Narheda: 3.50 Km). Total Length – 13.50 km, 2-Lane, Project Cost – 135 Cr.
22. Consultancy Services for preparation of DPR for green field Chambal Expressway in the State of MP/UP/Rajasthan. Total Length – 404 Km, 4-Lane, Project Cost – 12000 Cr.
23. Consultancy Services For Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Improvement to Yevat Malshiras Saswad Kapurhol Bhor Mandhardev Wai Surur road , Tal- Bhor & Wai. Dist.Satara & Pune – Package- 5. Total length – 57.96 Km, 2-Lane, Project Cost – 149.99 Cr.
24. Consultancy Services for Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Improvement to SH 9 to Dalaj Kalas Natepute Shinganapur Dahiwadi Pusesavali Karad SH-124 Section -Shingnapur Dahiwadi Pusesavali to Karad Dist. Satara – Package- 6. Total Length – 82 Km, 2-Lane, Project Cost – 246 Cr.
25. Consultancy Services for Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Improvement to Malharpeth – Umbraj -Masur-Mayani Dighanchi Pandharpur road SH 143 Section – Malharpeth Umbraj Masur Mayani to Satara Dist Border Dist. Satara – Package- 7. Total Length – 60 km, 2-Lane, Project Cost -180 Cr.
26. Consultancy Services for Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Improvement to Pandharpur Degaon Chincholi Takalisikandar Kurul to join SH 202 Road MDR 66 Km 0/000 to 33/900 Dist. Solapur- Package- 10. Total Length – 33.9 km, 2-Lane, Project Cost – 101.7 Cr.
27. Consultancy Services for Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Improvement to Chandgad Ibrahempur Chitale Shrugarwadi Ajar Burude Honewadi Mhagaon vyragewadi Hasur Sasgiri Narwad Halkarni Khanpur to Dist. Border State Highway No.201 Dist. Kolhapur and Improvement to Gargoti Pushpanagar Sonarwadi Madur Sheloli Vengrul Mamadapur Navale Vesarde Bagewadi Ukirbhatale Chakrewadi Palyach Huda Mathgaon Mani Patgaon Vanyashiwadi Shrigoan road MDR 52 Dist. Kolhapur- Package- 12. Total length – 81 km, 2-Lane, Project Cost – 212.25 Cr.
28. Consultancy Services for Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Improvement to Pusesavali Vangi Nagthane Walwa Borgaon Bahe Tambave Kasegaon Wategaon Takave road SH-158 km. 0/00 to 70/00 Tal.Walwa Dist. Sangli Package- 13. Total Length – 70 Km, 2-Lane, Project Cost – 210 Cr.
29. Consultancy Services for Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Improvement to Pusesavali Vangi Nagthane Walwa Borgaon Bahe Tambave Kasegaon Wategaon Takave road SH-158 km 70/00 to 147/500 Tal.Walwa Dist. Sangli Package- 14
30. Consultancy Services for Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Widening and improvement to pimparkhed girad pachora khadakdevla warthan ghatnandra shelgson nachanvel babras kanhori phulambri road, SH 48 in Tq Phulambri and Dist. Aurangabad -Package- 29. Total Length – 58.54 Km, 2-lane, Project Cost – 146.35 Cr.
31. Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity under Bharat Mala scheme. 3 (a) Pokharan – Fassund – Undu – Kashmir – Nimbala on NH-15. – 3 (b) Harsana – Phata to Uttarlai Aire base. Package No. BM-22). Total length – 150.60 Km, 2-Lane, Project Cost, 272 Cr.