Independent Engineer Services for Four laning of NH-365A from Kodad (Design km 0.00/ Existing km 185.00 of NH65) to Khammam (Design km 31.800 / Existing Km 29.400) in the state of Telangana under Bharatmala Pariyojana on Hybrid Annuity Mode (HAM). Total Length – 31.80 km; 4 lane; Project Cost: 1039.90 Crores
Nature of project: IE Supervision
Name of Client: National Highways Authority of India, Telangana
Length: 31.80 Km
Estimated capital cost of Project (in Rs. crores): 1039.90 Crores
Lane of Road: 4 Lane
Status: Completed
PPP / EPC / HAM / DBFOT / BOT: HAM
Duration- From January 2022 to October 2025