Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km 1+900 to km 90+000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) [AJ/Construction Supervision/Package-4]. Total length – 88.10 Km, 6-Lane, Project Cost – 1363.83 Cr.
Nature of project: AE Supervision
Name of Client: National Highways Authority of India
Length: 88..10 Km
Estimated capital cost of Project (in Rs. crores): 1363.83 Crores
Lane of Road: 6 Lane
Status: Completed
PPP / EPC / HAM / DBFOT / BOT: EPC
Duration- From Jan 2020 to Aug 2024