DPR Malbamori-Mangrol-Baran

Consultancy services for  preparation of feasibility Study  report cum preliminary  design report for Two laning of Malbamori – Mangrol-Baran (SH-01) funded by World Bank Trance-2. Total Length – 40.100 Km, 2 Lane, Project cost – 257 Cr. 

Nature of project: Detailed Project Report

Name of Client:  Public Works Department, Rajasthan

Length:  40.100 Km

Estimated capital cost of Project (in Rs. crores):  257 Crores

Lane of Road: 2 Lane

PPP / EPC / HAM / DBFOT / BOT:  PPP

Duration- From Aug 2021 to Aug 2022.

Office Address

B-256, 10-Scheme, Gopalpura Bypass Road

Jaipur, Rajasthan, India,302018.

 

Contact Us

Email: 

bd.pioneer2011@gmail.com

 

Contact Number: 

0141-2761891

 

Opening Hours: 

Mon-Fri  |  10AM-6PM