Consultancy services for preparation of feasibility Study report cum preliminary design report for Two laning of Golyana – Nawalgarh (MDR-25B) funded by World Bank Trance-2 . Total Length – 21.850 Km, 2 Lane, Project cost – 133.82 Cr.
Nature of project: Detailed Project Report
Name of Client: Public Works Department, Rajasthan
Length: 21.850 Km
Estimated capital cost of Project (in Rs. crores): 133.82 Crores
Lane of Road: 2 Lane
Status: Completed
PPP / EPC / HAM / DBFOT / BOT: PPP
Duration- From Aug 2021 to Aug 2022