Consultancy services for preparation of feasibility Study report / Detailed Project Report of selected road stretches for NH connectivity under Bharat Mala Scheme – 3(a) Pokharan – Fassund- Undu-Kashmir-Nimbhala (NH-15) 3(b) Harsana – Phata to Uttarlai Air Base ( Package No. BM-22) . Total Length – 150.60 Km, 2 Lane with Paved Shoulder, Project cost – 491.6 Cr.
Nature of project: Detailed Project Report
Name of Client: National Highway Authority of India
Length: 150.60 Km
Estimated capital cost of Project (in Rs. crores): 491.6 Crores
Lane of Road: 2 Lane + Paved Shoulder
Status: Completed
PPP / EPC / HAM / DBFOT / BOT: PPP
Duration- From March 2017 to May 2024