Consultancy services as the Authority’s Engineer for supervision of the construction of a two-lane highway with hard shoulders along NH-129A (Peren–Dimapur Section) in Nagaland, comprising Package I from Design Km 109.494 to Km 126.775 (17.281 km) and Package II from Design Km 126.775 to Km 146.450 (19.675 km), under the Bharatmala NH (O) – TSP programme through the EPC mode. Total Length – 36.714 km, 2-Lane with Hard Shoulders, Project Cost – ₹257.38 Crore.
Nature of project: AE Supervision
Name of Client: NHIDCL
Length: 36.714 Km
Estimated capital cost of Project (in Rs. crores): 257.38 Crores
Lane of Road: 2 Lane
Status: Completed
PPP / EPC / HAM / DBFOT / BOT: EPC
Duration- From Mar 2021–Dec 2025