Consultancy services for preparation of feasibility Study report cum preliminary design report for Two laning of Malbamori – Mangrol-Baran (SH-01) funded by World Bank Trance-2. Total Length – 40.100 Km, 2 Lane, Project cost – 257 Cr.
Nature of project: Detailed Project Report
Name of Client: Public Works Department, Rajasthan
Length: 40.100 Km
Estimated capital cost of Project (in Rs. crores): 257 Crores
Lane of Road: 2 Lane
PPP / EPC / HAM / DBFOT / BOT: PPP
Duration- From Aug 2021 to Aug 2022.